Monday, September 29, 2014

Flooring update

It's a little thing, but We got the 2 sticks of flooring ripped and installed in the craftroom this morning before work. 



So the craftroom floor is 100% done. I need to get a cabinet so we can finish the molding in the little bathroom.

And while we didn't get the carpet installed on Friday, they did come out and glue down all the tack strips in the master bedroom and upstairs. The glue needs to set before they stretch carpet over it. I have a lot of caulking and painting still to do. Have I mentioned how much I hate caulking???  Truly awful stuff...



No comments: