Monday, June 30, 2014

It's about having connections.

A BIG milestone was reached this week with the final connections of both gas and sewer. All utilities are in place and ready to work. The only loose end right now is the gas water heater has no vent stack yet. 
4" line from the house. 
Connection. The smaller line comes from the shop. Sandi already mentioned that we are having to raise the driveway for this, 10"-12".  This means a 56' retention wall (12x5") and now a 30' planter box of concrete. Since we are burying pipes, we will include power, water and a remoted french drain for the rain gutters.
Wolf the propane guy came out and did the final tank connections, and the range has been lit. I had to convert the range from NG to LPG but it was easy with the kit provided of 10 orifices.
Quite a difference between LP and NG. LP is smaller. 
I want to make cookies but I think Sandi has her sites set on the first boil-over. 