Hey, come on over to our house for a PARTY! Albeit, a WORK party... We are FINALLY ready to pull some romex. We've decided on June 18th. We have been nailing up boxes, marking plans and measuring routes so we will be prepared and ready to drill and pull wire starting at 8am (or whenever you can get here). If you're not into wiring, come by in the afternoon and help me say farewell to my 30's after the work is done. :-)
Friday, April 22, 2011
Radiator found!
It's been a long, cold winter, but ski season is finally over and we are re-focusing on the real house again! This is a radiator that Tom found on Craigslist a few months ago for a boost of heat at the front door. I wasn't thrilled with the idea of having an old-fashioned radiator at our entry door to be honest, but I understand the need for supplemental heat with the radiant floor system. He had looked at others but frankly, they were plain and kinda ugly. He sent me the link to this one and I loved it! I wish I'd taken a 'before' picture, but alas, I did not. It has this gorgeous scrollwork on each fin at the top and bottom. I had it sand blasted and powder-coated so it would hold up through the years. I think it came out pretty darn nice. I can't wait to warm my hands in front of it in the new house!!!

Friday, October 8, 2010
Aftermath and Moving On
A week after a damn fine party, thrown by my lovely wife and about 50 of our closest friends. The house is still semi-decorated, though it's coming down daily. Thank EVERYBODY for your thoughts and wishes whether you were there or not.
Now our focus goes back to work and the house.
We are so close to being done with the siding, with basically two sections left to do. The master bedroom face and the back deck and dormer area are what's left, and still a bunch of caulking.
I want to extend the perpetual invitation to anybody that would like to drop by and throw-in, regardless if we are having an organized "work party" or not. I'm going to try to keep a running list of things that need to be done, many of which really can be done or severely impacted in an hour or two or three. Practice your skills, challenge yourself if you like, be an extra hand for something, it's all here and if you don't know how to do something, we'll figure it out. That's how we're building this house, in fact, figuring out how to do stuff as we go. We've made mistakes, we correct them, we learn and get it done. Immensly rewarding so far, but we're impatient to get it done!
Here's an idea of things to do:
Now our focus goes back to work and the house.
We are so close to being done with the siding, with basically two sections left to do. The master bedroom face and the back deck and dormer area are what's left, and still a bunch of caulking.
I want to extend the perpetual invitation to anybody that would like to drop by and throw-in, regardless if we are having an organized "work party" or not. I'm going to try to keep a running list of things that need to be done, many of which really can be done or severely impacted in an hour or two or three. Practice your skills, challenge yourself if you like, be an extra hand for something, it's all here and if you don't know how to do something, we'll figure it out. That's how we're building this house, in fact, figuring out how to do stuff as we go. We've made mistakes, we correct them, we learn and get it done. Immensly rewarding so far, but we're impatient to get it done!
Here's an idea of things to do:
- Install siding
- Caulking
- Cut and screen vents
- Install deck ledger spacers and siding to cover tyvek
- Install door hardware on two french doors
- Dig up rain barrel to repair leaking connection
- Spread gravel under house
- Dig out sump pump under house, build brick wet-box for pump
- Route, plan and install vents for baths, kitchen, laundry, water heater (pending material)
- Route, plan and install gas piping (pending material)
- Route, plan and install vacuum system piping.
- Install soffet boards front and rear
- Mask windows for paint
- Paint the house (pending material)
- Connect the shed 110vac wiring feed from the house, final the hose bib there and cover the hole.
- Insulate (freeze protect) the exposed water collection lines where they enter the house.
OK that's it for now. Check back for updates, we'll see if I can keep this maintained. Sandi will at some point continue with the picture-post, but as you loyal readers know we're pretty hit-and-miss on doing updates.
Friday, September 10, 2010
Siding... with PICTURES!
Ok, only about a month behind in posting these... On our anniversary weekend (17 years... woo-hoo!) we had some wonderful family and friends come over to help us side our house. Nephew Matt was the first to arrive in the morning. Here is Tom and Matt setting up our anniversary gift to each other. My...ahem... OUR Bosch 4410, 10" sliding compound miter saw... can you hear Tool-Time Tim grunting right now? I really love that saw considering we did the entire north wall of the house with a Skil-Saw, the straight cuts of the Bosch are AWESOME!
I believe this is Tom and Wayne in the bucket putting up the trim pieces around the windows in the craftroom.
Here are Nephew Matt, my brother Matt and the fabulous Andria working on the backside of the garage.

Ed was our cut master that Saturday. He did a great job cutting for all the installing crews. There are a lot of angles on the different roofs and he kept up like a champ.
Sunday, August 29, 2010
What a Weekend!
Wow, so much done yet so much to do! It's a big shift from Sandi and I figuring out how to side our house to multiple people helping on the job, none of whom is a professional. But we dove in, figured out how to work it and knocked it in the ass! The most significant thing I learned is the difference in pace from working on the ground and ladders to using a high-lift and working two floors up.
SO much thanks goes out to our friends and family who took the time to lend us your time and your tools, and your help will be appreciated forevermore.
We will be siding and caulking over most of the Labor Day weekend, so feel free to drop on by if you want to check out progress.
I'll let Sandi post some pictures of the progress. It's almost her time to pick out colors for the house, though we don't really anticipate painting until next year.
Oh, and let's not let it slip by that Saturday was our 17th anniversary, for which this sidiing party was exactly what we wanted as a gift. That and the Bosch 4410L we bought each other. I sure love that girl!
Tom
SO much thanks goes out to our friends and family who took the time to lend us your time and your tools, and your help will be appreciated forevermore.
We will be siding and caulking over most of the Labor Day weekend, so feel free to drop on by if you want to check out progress.
I'll let Sandi post some pictures of the progress. It's almost her time to pick out colors for the house, though we don't really anticipate painting until next year.
Oh, and let's not let it slip by that Saturday was our 17th anniversary, for which this sidiing party was exactly what we wanted as a gift. That and the Bosch 4410L we bought each other. I sure love that girl!
Tom
Saturday, August 21, 2010
Siding Party!
We're inviting anyone who wants to come by next Saturday, the 28th, to throw in with us to make the Big Push on our siding. We practiced a bit, then went and helped the Morelands on thier siding, and now we think we know enough to git-er-done! We'll have a lift, food, ladders, food, saws, food, multiple nailers and we might have some food!
Starting around 8 and going until we're tired, it's dark or the food calls. Anybody that want's to hang overnight it welcome, and we'll certainly keep on it Sunday.
No need to RSVP, just show up!
Starting around 8 and going until we're tired, it's dark or the food calls. Anybody that want's to hang overnight it welcome, and we'll certainly keep on it Sunday.
No need to RSVP, just show up!
Monday, August 2, 2010
Subscribe to:
Posts (Atom)






